Renovation Adventures continued this weekend. Each stage of this part needs drying time. I poured the self leveling floor mix today. In preparation for that I ran spray foam around the base plate of each wall, and around each hole in the floor. Then I ran a bead of silicone caulk around that. Then put is some sill foam to help keep spacing for expansion. Today was the fun part. I bought two bags of LevelQuick. Each bag says it covers 50 square feet. Nope. I mixed both bags and poured. Barely covered half. So I made an emergency run to Home Depot. Got three bags, only needed two more. Mixed them and made the final pour. I’ll let it cure 16-24 hours before I walk on it. Getting excited with the completion of each step. The next phase is to install the cement backer boards on two walls and drywall on the other two. Still waiting on the delivery of the shower pan. Can’t start tiling until that gets here and installed.


Looks good Jeff. Lots of work!